Category: NPTEL

Programming in modern c++ | week 12, introduction to internet of things week 12, introduction to industry 4.0 and industrial internet of things | week 12, an introduction to artificial intelligence | week 12, the joy of computing using python | week 12, quantum mechanics 1 | week 12, programming in java | week 12, principles of management | week 12, leadership and team effectiveness | week 12, introduction to machine learning | week 12.

swayam-logo

Project Planning & Control

Note: This exam date is subjected to change based on seat availability. You can check final exam date on your hall ticket.

Page Visits

Course layout, books and references, instructor bio.

project planning and control nptel assignment answers

Prof. Koshy Varghese

Course certificate.

project planning and control nptel assignment answers

DOWNLOAD APP

project planning and control nptel assignment answers

SWAYAM SUPPORT

Please choose the SWAYAM National Coordinator for support. * :

  • NOC:Production and Operation Management (Video) 
  • Co-ordinated by : IIT Roorkee
  • Available from : 2019-11-13
  • Intro Video
  • Introduction to Production
  • Global Environment
  • Operations and Productivity
  • Types and Characteristics of Manufacturing Systems
  • Types and Characteristics of Services Systems
  • Product Design
  • Introduction To Forecasting
  • Time Series Forecasting
  • Time Series Forecasting- Exponential Smoothing I (Brief)
  • Time Series Forecasting- Exponential Smoothing II (Classification)
  • Time Series Forecasting- Working Example Of Exponential Smoothing I
  • Time Series Forecasting- Working Example Of Exponential Smoothing II
  • Time Series Forecasting- Working Example Of Exponential Smoothing III
  • Forecasting Errors
  • Causal Or Explanatory Methods
  • Inventory Planning and control
  • Basic Inventory Model
  • Different Variations in Basic EOQ Model
  • Safety Stock and Fixed Time Inventory Model
  • Examples of Safety Stock Calculation
  • Single Period Inventory Model-I (Theory)
  • Single Period Inventory Model-II (Numerical)
  • Inventory Control and Management
  • Material Requirements Planning (MRP)
  • Improvements in the MRP system
  • Lot Sizing in MRP Systems
  • Material Requirements Planning (MRP): Examples-I
  • Material Requirements Planning (MRP): Examples-II
  • Aggregate Sales and Operations Planning-I (Intermediate & Aggregate Planning)
  • Aggregate Sales and Operations Planning-II (Demand & Supply Options)
  • Aggregate planning Techniques-I (Introduction)
  • Aggregate planning Techniques-II (Examples)
  • Aggregate planning Techniques-III (Problems)
  • Production Planning Problems using LP
  • Nature of Quality and Evolution of Quality Management-I (Product Quality Dimensions)
  • Nature of Quality and Evolution of Quality Management-II (Service Quality Dimensions)
  • Modern Quality Management and Total Quality Management
  • Total Quality Management
  • Statistical Concepts in Quality Control-I (Overview of Control Charts)
  • Statistical Concepts in Quality Control-II (p-chart & Examples)
  • Statistical Concepts in Quality Control-III (c-chart & Examples)
  • Statistical Concepts in Quality Control-IV (Run Test & Examples)
  • Acceptance Sampling
  • Process Capability
  • Some Current Issues In Quality Management
  • Facility Layout-I (Introduction)
  • Facility Layout-II (Group Technology and other layouts)
  • Facility Layout-III (Layout design and Precedence diagram)
  • Introduction to Project Management
  • PERT and CPM
  • PERT and Crashing
  • Maintenance Management
  • Maintenance Performance Measures and OEE calculations
  • Manufacturing Operations Scheduling-I (Scheduling & Gantt Charts)
  • Manufacturing Operations Scheduling-II (Order Sequencing)
  • JIT and Lean Operations
  • Work Method Analysis, Work Measurement and Learning Curve
  • Some Latest and Future Issues
  • Watch on YouTube
  • Assignments
  • Download Videos
  • Transcripts

NPTEL Project Management Week 7 Assignment Answers

NPTEL Project Management Week 7 Assignment Answers:- In this post, we have provided the answers to the NPTEL Project Management Week 7

NPTEL Project Management Week 7 Assignment Answers 2022

Question number 01 to 06 is based on the following data for a given project:

You are the project manager of a project to build toilets across a district under Swatch Bharat Abhiyan. You are to build two toilets a month for 12 months. Each toilet is planned to cost S100. Your project is scheduled to last for 12 months. It is the beginning of month 10. You have built 20 toilets and your CPI is 0.9091.

Q1. How is the project performing?

Important Links:-

NPTEL Answers

Join Our Telegram

Leave a Comment Cancel reply

Save my name, email, and website in this browser for the next time I comment.

DBC Itanagar

All India News

[Week 4] NPTEL Project management for managers Assignment Answer 2023

admin

NPTEL Project management for managers Assignment Answer 2023

Project management for managers

NPTEL Project Management For Managers Week 4 Assignment Answers 2023

1. Which of the following is not a discounted capital budgeting technique?

  •  Discounted PBP
  •  Pr o fitability index

2. Internal Rate of return (IRR) is the discounting rate in which Net Present value (NPV) is equal to _.

3. Which of the following statement is false about ARR method?

  • It takes into account accounting profits
  • It considers t ime v alue of money
  • Cut off rate is chosen by management
  • The concept of average investment and average earnings differ widely

4. Mr X wants to receive 120,000 every year for next 10 years (starting from next year from now). How much money should he deposit now? The int e rest rate is 10%.

5. Calculate the net present valu e of a project which requires an initial investment of $243,000 and it is expected to generate a cash inflow of $50,000 each month for 12 months. Assume that the sal v age value of the project is zero. The target rate of return is 12% per annum.

6. The first p u blic offering of equity shares of a company, which is followed by a listing of its shares on the stock market is called?

  •   IO P

7. The first public offering of equity shares of a company, which is followed by a listing of its shares on the stock market is called?

8. Which of the following is n o t a key factor for determining the debt-equity ratio for a project?

  • Nature of assets
  • Business risk
  • Pr ic e elasticity

9. Who are the owners of a company?

  •  Creditors
  •  Equity Share h olders
  •  Managers
  •  Debenture holders

10. Which of the following is not t r ue about Net present Value (NPV)?

  •  It considers all cash flows
  •  It considers time value of money
  •  It considers risk factors
  •  It allows expe c ted changes in cost of capital

NPTEL Project Management For Managers Week 3 Assignment Answers 2023

1. Which one of the followi n g is not an MCDM technique?

  •  SMART
  •  TOPSIS

2. In order to get a “feel” of the relationship between the product and its market, the project analyst may informally talk to customers, competitors, middlemen, and others in the industry. This is a ___________________ analysis?

  •  Demand Analysis
  •  Situational Analysis
  •  Customer A n alysis
  •  Product Analysis

3. In TOPSIS, how are the alternatives ranked?

  •  Based on their proximity to the ideal solution and their distance from the negative ideal solution
  •  Based on their random assignment of ranks
  •  Based on their alphabetical o rder
  •  Based on their initial order in the dataset

4. How normalized score is calculated in TOPSIS method?

  • Rij=xij/(Σx2ij)
  • Rij=xij/(Σxij)
  • Rij=x i j/(Σx3ij)
  • Rij=xij/(Σx4ij)

5. Which of the following is not a quantitative forecasting method?

  •  Trend projection
  •  Exponential smoothing
  •  Delp h i
  •  Moving Average

6. Which of the following is not related to Information sought in market survey?

  •  Total demand
  •  Price elasti c ities
  •  Purchasing plans
  •  Production schedule

7. Which of the following is not a key step in Mark e t and Demand Analysis?

  •  Situational analysis
  •  Market survey
  •  Resource p l anning
  •  Characterization of the market

8. Which of the following is not a Causal method?

  •  Chain ratio method
  •  Jury execution method
  •  End use met h od
  •  Econometric method

9. Which of the following is not a step in a sample survey?

  •  Selecting sample size
  •  Developing questionnaire
  •  Resour c e planning
  •  Scrutinizing

10. Which of the following is a limi t ation of TOPSIS?

  •  It can only handle binary decision problems
  •  It assumes all criteria are equally important
  •  It requires a large amount of computational resources
  •  It is not suita b le for multi-objective optimization

NPTEL Project Management For Managers Week 2 Assignment Answers 2023

1. Which of the following is not a classification of Brownfield projects?

  • Diversification
  • Modernization
  • Vertical Integration

2. Project Life Cycle generally does not define which of the following?

  • Technical work
  • Deliverables
  • Control and approval

3. Which of the following is the longest phase of a Project life cycle in terms of time?

  • Concept phase
  • Implementation phase
  • Planning phase
  • Termination phase

4. What is the correct sequence of Project Life Cycle phases?

  • Initiation, Implementation, Planning and Project Clean-up
  • Initiation, Project Clean-up, Planning and Implementation
  • Initiation, Project Clean-up, Implementation and Planning
  • Initiation, Planning, Implementation and Project Clean-up

5. Arrange the following elements of the Project Cycle in the right order: A- Project Appraisal B- Feasibility Analysis C- Negotiation D- Project Selection

6. Select the correct statement.

  • Stakeholder identification should be completed prior to constructing the project charter
  • Stakeholder identification should be performed at the beginning of each project phase
  • Where a project begins pursuant to a contract, stakeholder identification is not necessary
  • Stakeholder identification is a continuous process that should be performed throughout the entire project life cycle

7. BCG Matrix is used for?

  • Project appraisal
  • Project selection
  • Project controlling
  • Project budgeting

8. Project identification is generally done through ___ ?

  • Brainstorming
  • Questionnaire
  • Fundamental analysis
  • Technical analysis

9. New ventures by fresh entrepreneurs/promotors are _ ?

  • Greenfield projects
  • Brownfield projects
  • Conglomerate projects
  • Concentric projects

10. Which of the following is not correct about initial phase of a project?

  • The cost associated at the beginning of the project is highest
  • Stakeholders have maximum influence during this phase
  • The highest uncertainty is at this stage of the project
  • All the above statements are correct.

NPTEL Project Management For Managers Week 1 Assignment Answers 2023

1. Which of the following is not a project management goal?

  • Keeping overall costs within budget
  • Delivering the software to the customer at the agreed time
  • Maintaining a happy and well-functioning development team
  • Avoiding customer complaints

2. Which of the following does not constitute the role of a project manager?

  • Integrator and coordinator
  • Business case approval
  • Project delivery
  • Project planning and controlling

3. Effective communication is one of the most important skills required by

  • The project team
  • The management
  • The project Manager
  • The project Contractor

4. Which of the following is not an objective of a project?

5. What does ‘R’ represent in a SMART project?

6. What does term ‘KSTT’ stands for with respect to project management?

  • Knowledge, Skills, Tools and Technology
  • Knowledge, Skills, Techniques and Technology
  • Knowledge, Skills, Tools and Techniques
  • Knowledge, Skills, Tools and Time

7. Which of the following is not a Project Management Maturity Model?

  • SEI’s (Software Engineering Institute)
  • Center for Business Practices
  • ETI (Education Technical Institute)
  • Kerzner’s model

8. What does ‘PMMM’ stands for?

  • Project Management Measurement Model
  • Project Management Maturity Model
  • Project Management Mixed Model
  • Project Management Mass Model

9. _______ is an organizational unit to centralize structure with specific mandated that can include an enterprise-wide perspective?

  • Project Management
  • Project Management Office
  • Functional department
  • None of the above

10. What are the determinants of project success as per Iron Triangle?

  • Resources, Cost, Performance
  • Knowledge, Time, Resources
  • Cost, Skills, Performance
  • Cost, Performance, Time

NPTEL Project management for managers Assignment Answer Week 1 2022

1. Developing a technology is an example of 

  • Project 
  • All of the above

2. Following is(are) the responsibility(ies) of the project manager:

  • Budgeting and cost control
  • Allocating resources
  • Tracking project expenditure

3. Project performance consists of

4. Project and organizational strategy is nothing but science of 

  • Formulation to achieve objective 
  • Implementation to achieve objective
  • Evaluating cross functional decisions to achieve objective

5. What are the criteria on which a project is evaluated

  • Time and Cost
  • Cost and Performance
  • Performance only
  • Time, Cost and performance

6. What are the determinants of a project success?

  • Scope, Performance, Time, Client acceptance
  • Time, Scope, Performance, Cost/Budget
  • Scope, Cost/Budget, Performance, Time, Client acceptance
  • Client acceptance

7. Project success includes the dimensions such as

  • Project efficiency, Impact on customers, Business success, Future preparation
  • Project efficiency, Impact on customers 
  • Project efficiency, Impact on customers, Business success
  • Impact on customers, Business success, Future preparation

8. If project is organized as a weak matrix, the project manager seeks a commitment of work from the 

  • Personnel’s 
  • Functional Departments
  • Subcontractors 
  • Senior Manager

9. The entire process of a project may be considered to be made up on number of sub process placed in different stage called the 

Technical key resources  Work key structure Work Breakdown Structure (WBS) None of the above

10. Following are the characteristics of Project Mindset:

Time, Responsiveness, Information sharing, Processes, structured planning  Time, Project management, Information sharing, Processes, structured planning  Time, Responsiveness, Information sharing, capability, structured planning Time, Responsiveness, Information sharing, Processes, project planning

NPTEL Project management for managers Assignment Answer Week 2 2023 . Which project is not based on risk?

  • Cooperative

2. Which are the essential parts in the brown field project?

  • Expansion, vertical integration, and Diversification
  • Vertical integration and Diversification
  • Diversification and Expansion

3. A green field project is a project when you 

Finish a project Continue with the same project  Start a new project Diversify a project

4. Steel industry moves for manufacturing of steel pipes is an example of 

  • Forward integration
  • Backward integration
  • Horizontal integration

5. Upstream expansion is called

6. Conceptual phase and definition phase are an integral part of 

  • Planning and organizing phase
  • Initiation phase
  • Project clean up phase

7. Selection of a project is broadly a function of

  • Risk, Returns and Resources
  • Risk and Returns
  • Return only 

8. During brainstorming session, the management has to be

  • Vision for future growth
  • Keep long term objectives in mind 

9. Boston consultancy group matrix give idea where there is a lack 

  • In portfolio
  • Of resources

10. Boston consultancy group matrix is basically an order of

NPTEL Cyber Security and Privacy Assignment Answers 2023

Latest News

Nptel soft skill development week 1 assignment answers 2024.

CBSE Schools

CBSE Schools : सीबीएसई बोर्ड की बड़ी कार्रवाई ! बिहार – झारखंड के 36 स्कूलों की मान्यता रद्द, देखें पूरी लिस्ट.

Bank Holidays 2024

Bank Holidays 2024 : जनवरी में 16 दिन बंद रहेंगे बैंक, ब्रांच जाने से पहले चेक कर लें छुट्टियों की लिस्ट.

Maruti Swift Engine

32 के तगड़े माइलेज से Creta की वाट लगा रही Maruti की शानदार कार, बेहतरीन फीचर्स के साथ इतनी है कीमत

Indian Oil Corporation Limited

Indian Oil Corporation Limited 1603 Recruitment इंडियन ऑयल कॉरपोरेशन लिमिटेड अप्रेंटिसशिप 1603 पदों पर भर्ती

Sign in to your account

Username or Email Address

Remember Me

404 Not found

IMAGES

  1. NPTEL Principles of Management Week 4 Assignment Solutions 2021

    project planning and control nptel assignment answers

  2. NPTEL Principles of Management Week 5 Assignment Solutions 2023 || Jan

    project planning and control nptel assignment answers

  3. Nptel Assignment 1 Answers of basics of material engineering

    project planning and control nptel assignment answers

  4. NPTEL Project Management For Managers Assignment 3 Answers || Week 3

    project planning and control nptel assignment answers

  5. Answers of nptel Microprocessors And Microcontrollers Week- 1 Assignment- 1

    project planning and control nptel assignment answers

  6. SWAYAM NPTEL Project Management for Managers Week 6 Assignment 6 Answers for August 2022

    project planning and control nptel assignment answers

VIDEO

  1. NPTEL Assignment 07 Solutions for Engineering Drawing and Computer Graphics

  2. NPTEL Project Management Week 6 Assignment Solutions || Feb

  3. NPTEL Project Management Week 2 Assignment Solutions (Feb

  4. NPTEL Project Management For Managers Assignment 2 Answers

  5. Week 1

  6. Week 6

COMMENTS

  1. NPTEL :: Civil Engineering

    Lesson 7. Project Monitoring & Control - Typical Project Time Monitoring Process, Levels and Frequency of updates: Download: 47: Lesson 8. Project Control Process, Daily Progress Report, Macro Level Update- Data Need, Standard Progress Reports: Download: 48: Lesson 9. Application: Two Span Bridge - ES Schedule: Download: 49: Lesson 1.

  2. Project Planning & Control Assignment 1

    Week1_Assignment1.docx - Free download as PDF File (.pdf), Text File (.txt) or read online for free. NPTEL PROJECT MANAGEMENT ASSIGNEMENT

  3. NOC

    Course abstract. This course will cover the basic concepts in Project Planning and Control with a focus on construction projects. The course is relevant to Civil Engineering senior level undergraduate as well as post-graduate students in the area of construction management. Practicing engineers who are part of the planning team on construction ...

  4. project planning control nptel assment answer

    About Press Copyright Contact us Creators Advertise Developers Terms Privacy Policy & Safety How YouTube works Test new features NFL Sunday Ticket Press Copyright ...

  5. Project Planning & Control

    There will be a live interactive session where a Course team member will explain some sample problems, how they are solved - that will help you solve the weekly assignments. We invite you to join the session and get your doubts cleared and learn better. Date: July 29, 2023 - Saturday. Time:06.00 PM - 08.00 PM.

  6. Project Management : Planning, Execution, Evaluation And Control

    Project management has developed to the point where it is a professional discipline having its own body of knowledge and skills. In order to achieve business excellence, it is necessary to develop expertise in project planning, executing, evaluating, and managing projects. The course would help the academics as well as practicing managers and ...

  7. Project Planning & Control

    The questions will be on the computer and the answers will have to be entered on the computer; type of questions may include multiple choice questions, fill in the blanks, essay-type answers, etc. ... Project Planning & Control : Assignment 0 is live now!! ... Project Planning & Control: Welcome to NPTEL Online Course - July 2022!!

  8. Project Planning & Control

    Project Planning & Control: Open now for exam registration July 2021! Dear Candidate, Here is a golden opportunity for those who had previously enrolled in this course during the July 2020 semester, but could not participate in the exams or were absent/did not pass the exam for this course. This course is being reoffered in July 2021 and we are giving you another chance to write the exam in ...

  9. NPTEL Assignment Answers And Solutions Jan-Apr 2024 Progiez

    NPTEL Assignment Answers and solutions of all courses. Week 1,2,3, 4, 5, 6, 7 , 8, 9, 10 ,11, 12 Answers. By Swayam platform. Jan Apr 2024 by progiez

  10. NPTEL :: Management

    Modules / Lectures. Lecture 1: Introduction to Project Management. Lecture 2: Introduction to Agile Project Management. Lecture 3: Project Management Process for a Project-I. Lecture 4: Project Management Process for a Project-II. Lecture 5: Project Management Process for a Project-III. Lecture 6: Project Stakeholder and Risk Management.

  11. NPTEL Project Management For Managers

    assignment link - https://onlinecourses.nptel.ac.in/noc23_mg107/unit?unit=49&assessment=164NPTEL Project Management For Managers | WEEK 4 ASSIGNMENT ANSWERS ...

  12. NOC

    This course will cover the basic concepts in Project Planning and Control with a focus on construction projects. The course is relevant to Civil Engineering senior level undergraduate as well as post-graduate students in the area of construction management. Practicing engineers who are part of the planning team on construction projects will ...

  13. Project Planning & Control

    Project Planning & Control. This course will cover the basic concepts in Project Planning and Control with a focus on construction projects. The course is relevant to Civil Engineering senior level undergraduate as well as post-graduate students in the area of construction management. Practising engineers who are part of the planning team on ...

  14. Project Management for Managers

    #nptel #cryptographyandnetworksecurity #nptelanswersCOURSE- Cryptography and Network SecurityORGANIZATON- IITPLATFORM- SWAYAMIn this video, you can solutions...

  15. Project Management : Planning, Execution, Evaluation And Control

    ABOUT THE COURSE: Projects are the modus operandi of implementing organizational strategy and achieving strategic goals and objectives. Its importance is well-acknowledged and pervasive in the business world such as construction, engineering, mining, hi-tech, electronics, logistics, defense forces, product development, R&D, and so on.

  16. NPTEL :: Management

    NPTEL provides E-learning through online Web and Video courses various streams. Toggle navigation. ... Introduction to Project Management: Download: 52: PERT and CPM: Download: 53: PERT and Crashing: Download: 54: Maintenance Management: ... Inventory Planning and control: Download Verified; 17: Basic Inventory Model : Download To be verified; 18:

  17. NPTEL Project Management For Managers Assignment 5 Answers 2021

    NPTEL Answers of Project Management and Managers Week 5 Assignment 5 2021Note:- Every student is requested to submit their assignments on the knowledge of th...

  18. NPTEL Project Management Week 7 Assignment Answers

    Answer:- All of the above. Q9. The first step in project crashing is: Choose the task or tasks on the critical path with the lowest crash cost. List the crash costs for each task in the project. Update the lengths of all affected paths in the network. Identify new critical paths.

  19. [Week 4] NPTEL Project management for managers Assignment Answer 2023

    Answer :- In portfolio. 10. Boston consultancy group matrix is basically an order of. 5*5. 4*4. 3*3. 2*2. Answer :- 2*2. TAGGED: assignment 2 solutions, assignment 3 solutions, nptel answer key, nptel assignment answer week 1, nptel assignment answers 2023 week 1, NPTEL Project management for managers Assignment Answer 2023, NPTEL Project ...

  20. [Week 3] NPTEL Project Management For Managers Assignment Answers 2023

    NPTEL Project Administrator Since Managers Week 3 Associate Answers 2023. 1. Which one of the following is not an MCDM technique?. AHP; SMART; PERT; TOPSIS; Answer :-For Answer Click Here2. In click to get a "feel" concerning the relationship between the product press its market, the project analyst may informally talk to customers, competitors, middlemen, and others in the industry.